GOVERNOR MARIO
M. CUOMO BRIDGE
(TAPPAN ZEE)
Westchester and
Rockland County, NY
PROJECT SCOPE
DGA’s design for the illumination of the Governor Mario M. Cuomo Bridge to replace the old Tappan Zee Bridge encompasses nearly three miles of roadway lighting, dynamic color-changing articulation of major structural features, adjacent bikeway and walkway, pedestrian plazas and associated support facilities. Signature touches include the washing of multiple bridge surfaces such as the cables, towers and piers with programmable LED luminaires, as well as roadway and shared-use path lighting designed for nighttime safety and expressive daytime form.
AWARDS
2020 IES Illumination Award of Merit
2019 ACEC Diamond Award
2019 ACEC Grand Award
2019 ASCE Design-Build Project of the Year
2019 IFCE Merit Award
2018 NSBA Accelerated Bridge Construction Commendation
OWNER
New York State Thruway Authority
DESIGNER - BUILDER
Tappan Zee Constructors
LEAD DESIGNER
HDR